
Tub to Shower Conversion
Holiday offer: $1,350 off your shower remodel See the offer
Designed and built by GI Construction
Your new walk-in shower, right where the tub was
We take out the bathtub and build a tiled walk-in shower in its place: new plumbing, a waterproofed floor and walls, tile to the ceiling, a niche and a tiled bench included free, and frameless glass. About a week for the shower. Across the whole Las Vegas valley.

Isaac Reuven, the company's president, is involved in every project, from start to finish.
★ 5.0 · 144 Google reviews · 22 client video reviews · NV license #0081239

Holiday offer
$1,350 off your shower remodel
Free estimate with a free 3D design of your new shower
On a full shower or bathroom remodel signed by December 31, 2026. One discount per project: seniors and military get $1,000 off all year, or this offer if it is bigger.
Claim my holiday offerTub to shower conversion in Las Vegas
Our Completed Walk-In Shower Projects
Real GI Construction walk-in showers across the Las Vegas valley. Tap one to see the whole project.
Right for you?
Turning a tub into a walk-in shower
A tub to shower conversion takes out the bathtub and builds a shower in the same space. In a hall bathroom the tub space is about 5 feet long and 2½ feet deep; the new walk-in shower fills it wall to wall, 2½ to 3 feet deep.
Of the 29 homeowners who asked us to swap a tub for a walk-in shower and got a proposal, 21 had a shower-only room on it. Not every bathroom loses its tub: in the guest and hall bathrooms on our proposals, about one room in three kept a tub. We talk it through with you at the estimate.

Your options
What your tub can become
Most often, a tiled walk-in that fills the tub space, with a low curb and frameless glass. A niche and a tiled bench come free with every tiled shower. Many Las Vegas tub walls have a high window: it stays inside the new shower, wrapped in tile, the sill sloped toward the drain. In master baths, a garden or jetted tub and the small stall beside it become one big walk-in across the end, often with a bench under the window.
Also: a tiled half wall about 42 inches high with glass on top, often with grab bars; no curb, for a wheelchair or a shower chair; and frameless glass instead of a curtain.
Rather keep a tub? We set a new one and tile the walls above it to the ceiling, with a niche.
Have a shower and want a tub back? We take out the shower stall and set a tub with a tiled shower above it.


Free with every estimate
Free 3D design of your new shower
At your free estimate we take photos and measurements of your bathroom and talk through what you want: the shower size, the glass, the tile, the niche.
Then we draw the layout and send you a realistic 3D design of your new shower with your estimate, like a photo of the finished room, so you see it before we build it. Change anything you like before you decide.
How it works
Four easy steps to your free estimate
- Fill out the short formLeave your name, number and address. It takes a minute. Or call (702) 508-1188.
- We meet at your homeWe come to you and put your free estimate together with you, right there in your bathroom.
- You get it by e-mailYour free estimate, a 3D design of your new shower and copies of our license and insurance.
- You decideTell us what you’d like to change, or that you’re ready to start. We take it from there.
Free estimate
Like what you see?
Let’s plan yours.
1:06The people really care. They care about their work, they care about how it’s left.
- ★ 5.0 · 144 Google reviews
- Free 3D design
- 22 client video reviews
- NV license #0081239
Seniors and military: $1,000 off a full shower or bathroom remodel, all year. One discount per project: you get the larger one.
Rather talk? (702) 508-1188
Free estimate at your home
Send this and we call you to set a time.
Prefer to talk? Call (702) 508-1188
★ 5.0 · 144 Google reviews · NV license #0081239
Our clients, on camera
22 video reviews from our clients
1:21They told us it'd be about three weeks to do the job … and it took all of three weeks.
Wayne and Darlene · master bathroom
2:01Don't try to go a cheaper way out, because then you'll end up paying money and then paying more money.
Walk-in shower, rebuilt after another contractor
0:47It's just super straightforward and low stress.
Britney · bathroom remodel
1:06The people really care. They care about their work, they care about how it's left.
Three bathrooms in one house
0:57They really listened to what we wanted in our space.
Custom shower
0:30They were very attentive to detail, as you can see from the bathroom.
Bathroom remodel
0:15GI Construction did a fabulous job of renovating my bathroom.
Bathroom remodel
0:29Everything came out as expected, if not better.
Bathroom remodel
0:42I've already told my friends that I really like this company.
Bathroom remodel
0:18Great timing, great price and great construction progress.
Bathroom remodel
0:46They cleaned up after themselves and took care of our house while they were doing it.
Bathroom remodel
0:26He started the day he was going to start … they kept everything clean.
Bathroom remodel
0:52Everything was communicated about what was going to happen ahead of time, so I knew what to expect.
GI client
0:35I don't think I could have done it any better myself.
GI client
0:22They do what they say they want to do, and that's kind of the most important thing.
GI clients
0:21My experience with GI Construction was top and bottom amazing.
GI client
0:19Everybody was respectful … they cleaned up after themselves.
GI client
0:37From the beginning to the end, actually, everything has been fantastic.
GI client
0:16They were always here on time … I would highly recommend.
GI client
0:24We picked GI because we know they are consistent, they're reliable.
GI client
0:54They knew where to go buy materials, how to work the insurance companies.
First-time home buyer
0:48This is our second project with Isaac … we're pleased with both of them.
Two projects with GI
Peace of mind
Licensed, insured and bonded
- Licensed general contractorNevada B-2 Residential and Small Commercial, license #0081239.
- Workers’ compensationIf someone gets hurt working on your job, it’s covered.
- $1M / $2M liability$1 million per claim, $2 million per year, to protect your home and property.
- BondedA $30,000 contractor’s license bond.
- 1-year warrantyIn writing, on our work.
Every client gets copies of our license and insurance. See our license on the Nevada State Contractors Board →
Where we work
Tub to shower conversions across the Las Vegas valley
Every pin is a bathroom we’ve finished, shown near the home, never on it. Tap one to see the project.
- Las Vegas
- Henderson
- Summerlin
- North Las Vegas
- Boulder City
- Spring Valley
- Enterprise
- Anthem
- Southern Highlands
- Centennial Hills
- Lake Las Vegas
- Inspirada
Questions
Tub to shower conversion questions we hear most
How much does a tub to shower conversion cost in Las Vegas?
It depends on the size of the space, the glass and extras such as a second niche or no curb. Taking out a tub is the same job for us as rebuilding a shower. Your exact price comes at the free estimate, after we see the room.
How long does it take to convert a tub to a shower?
About one week, sometimes up to a week and a half, the same as any new tiled shower. The shower floor and the waterproofing each dry 24 to 48 hours before tile goes on.
Is it a good idea to replace a tub with a walk-in shower?
Many of our clients decide yes: of 29 homeowners who asked us for it and got a proposal, 21 had a shower-only room on it. Many homes still keep one tub somewhere; in the guest and hall bathrooms on our proposals, about one in three kept a tub.
Can you convert a garden tub or a jetted tub into a shower?
Yes. In master bathrooms, the deck tub and the small stall beside it often become one big walk-in shower across the end of the room. It is the master bathroom job we do most.
What happens to the window above my tub?
It stays. We wrap it in tile inside the new shower and slope the sill toward the drain. Many Las Vegas tub walls have one.
Can you turn a shower back into a tub?
Yes. We can take out a shower stall and set a tub with a tiled shower above it.
What about a one-day tub to shower conversion?
We build tiled showers. A tiled shower needs the floor and the waterproofing to dry before the tile goes on, so it takes about a week. If you want a panel shower with no grout, we can build that too.
Can the new shower have no curb, for a wheelchair?
Yes. We lower the floor so there is no step. See roll-in showers and ADA bathrooms.
Does converting a tub to a shower hurt resale value?
It can, depending on who buys your home. NAR's news site says that taking out the tub and enlarging the shower "could actually hurt a property's resale value" for some buyers. A 2021 National Association of Home Builders survey found that 72 percent of first-time buyers rated a primary bath with both a shower stall and a tub as essential or desirable. That is why we do not take the tub out of every bathroom. In the guest and hall bathrooms on our proposals about one room in three kept a tub, and about a third of the master bathrooms kept a tub next to a separate shower. We talk through which bathroom should keep one at the estimate.
Is it cheaper to replace a tub or convert it to a shower?
In our records they land close together. Among our signed jobs since November 2023, a new tub with tiled walls and a tiled walk-in shower without glass sit in about the same range. Frameless glass is what moves the shower above the tub. Nine tub jobs is a small number, so take it as a guide, not a rule. Taking out a tub is the same job for us as rebuilding a shower, so your exact price comes at the free estimate, after we see the room.
Do I have to remove the old tub myself?
No. Taking out the tub is part of our job. We protect the floors and the rest of the house, set a dumpster, and tear out the tub, the tile around it and the wall board, down to the studs. Then the new shower is built from the studs up. For us, taking out a tub and rebuilding an old shower are the same work, so we price them together. You do not need to cut the tub up or haul it away. Licensed plumbers do the plumbing, and nothing is closed up until it passes a leak test. The waterproofing on the floor and walls gets a flood test before any tile goes on.
Is a walk-in shower easier to get into than a tub?
A tub has a wall you step over. A walk-in shower has only a low curb, or no curb when we lower the floor. While the wall is open we can add what makes a shower easier to use: wood blocking for grab bars, which are set through the tile afterwards, a tiled bench (one comes free with every tiled shower), and a hand shower on a slide bar. Grab bars are part of the remodel, not a stand-alone job. Of 13 homeowners who asked us for grab bars or a safer bathroom and got a proposal, 12 ended with a shower and no tub. For a wheelchair or shower chair, see roll-in showers.
What is a tub to shower conversion?
It takes out the bathtub and builds a shower in the same space. In a hall bathroom the tub space is about 5 feet long and 2½ feet deep, and the new walk-in fills it wall to wall, 2½ to 3 feet deep. The new shower has a sloped concrete floor, a waterproofing membrane, tile to the ceiling, a niche, and usually frameless glass. A tub and shower combo is a different choice: we set a new tub and tile the walls above it. For us a tub to shower conversion is the same job as rebuilding an old shower, so it takes about a week.
Does the plumbing have to be moved when a tub becomes a shower?
Every shower we price includes a new valve and a new drain, set by licensed plumbers. Only a big move needs more: another wall, or a much bigger shower, means new water lines in the wall, and that is added to your estimate. We do not take plumbing-only jobs. The plumbing comes as part of the remodel, and we test it for leaks before anything is closed up. The shower head and hand shower on a slide bar are set at the end, once the tile is done. On most jobs you choose and buy the fixtures, and your estimate lists exactly what is included.
Can you replace my tub with a new tub instead of a shower?
Yes. The old tub, its tile and the wall board come out first. Then we set a new tub, put in the cement board and the waterproofing, and tile the walls above the tub to the ceiling, with a niche. If you want no tile, a tub with three acrylic wall panels is another option. A new alcove tub went into 56 of our 182 signed bathroom proposals since November 2023, so keeping a tub is a normal choice. It makes the most sense in the bathroom where someone still takes baths. In the other bathrooms, the walk-in shower usually takes the tub's place.
Do you need a permit for a tub to shower conversion?
In the City of Las Vegas, yes. Its homeowner’s guide says a permit is required to alter piping inside a wall, ceiling or beneath a floor, and a tub to shower conversion replaces the shower valve inside the wall and the drain under the floor. New tile alone needs no permit, the same guide says. When your job needs one, we handle the whole permit for you, start to finish, and we talk it through with you at the free estimate. Other parts of the valley have their own building departments, so we check the rules for your address.
Can I do a tub to shower conversion myself?
Nevada lets homeowners work on a single-family home they live in and do not plan to sell or rent, and the City of Las Vegas guide says homeowners may do the plumbing in their own home. You still need the permit, and the work gets inspected. The hard parts are the ones you cannot see later: a concrete floor sloped to the drain, a waterproofing membrane that passes a flood test, and plumbing that passes a leak test before the wall is closed. The floor and the membrane each need 24 to 48 hours to dry. If you would rather not, a tub to shower conversion is the whole job for us, in about a week.
Is there a tub to shower conversion kit?
Yes. A premade shower pan with three acrylic wall panels takes the tub’s place with no tile at all. We install those too: the tub comes out, the pan is set, the panels go up, and everything is connected and sealed. The other way is a tiled shower, like the ones in the photos on this page: a concrete floor sloped to the drain, a waterproofing membrane, tile to the ceiling and a niche, and the tile can wrap a window inside the shower. We go over both at the free estimate.
Will Medicare pay for a tub to shower conversion?
Original Medicare does not. A CMS policy article says it plainly: “Home modifications are noncovered by Medicare.” Some Medicare Advantage plans may choose to offer bathroom safety devices as an extra benefit, so check your plan’s Evidence of Coverage before you count on anything. We cannot promise that Medicare, an insurer or anyone else will pay for your remodel. There is more on this on our senior bathroom remodel page.
What is the most expensive part of a tub to shower conversion?
The frameless glass is one of the biggest parts. In our signed jobs, the same tiled walk-in shower costs clearly more once frameless glass is added. The rest is the work itself: the tear-out, the plumbing, the sloped floor, the waterproofing and the tile. On most jobs you choose and buy the tile and fixtures, so your picks set that part of the cost.
Who does the plumbing?
Licensed plumbing contractors do the plumbing inside our remodels. We do not take plumbing-only jobs.
Is GI Construction licensed?
Yes. GI Construction LLC is a Nevada licensed B-2 Residential and Small Commercial contractor, license #0081239.
Is the estimate free?
Yes. We come to your home, look at the bathroom and give you a price, with a free 3D design of your new shower. You decide after that.
What areas do you serve?
Las Vegas and the whole valley: Henderson, Summerlin, North Las Vegas, Boulder City, Spring Valley, Enterprise, Anthem, Southern Highlands, Centennial Hills and nearby areas.
Ready for a new bathroom?
Send the short form and we call you to book your free estimate. We come to your home, look at the room and give you a price.
GI Construction LLC · Nevada licensed B-2 Residential and Small Commercial contractor, license #0081239 · 410 S Rampart Blvd, Suite 390, Las Vegas, NV 89145

Mosaic Stripe & Center Drain
Brick-Look Tile & Gold Fixtures
Window Shower & Pebble Niche
Gray Stone-Look Shower & Drop-In Tub