A GI shower remodel in a Downtown Las Vegas spa bathroom: wood-look tile walls, a window, two niches, a black rain shower and a long tiled bench

Shower Remodel

Holiday offer: $1,350 off your shower remodel See the offer

Designed and built by GI Construction

Your new shower, from the tear-out to the glass

We tear out the old shower and build a new one in the same spot: a new valve and drain, a waterproofed floor and walls, tile to the ceiling, a niche and a tiled bench included free, and frameless glass. Across the whole Las Vegas valley.

Isaac Reuven, president of GI Construction

Isaac Reuven, the company's president, is involved in every project, from start to finish.

Free estimate

A GI shower remodel: a marble-look corner shower with a tiled half wall, frameless glass and matte black fixtures, beside a white freestanding tub
A gold rain shower head and a gold faucet tied with red Christmas bows on marble tile

Holiday offer

$1,350 off your shower remodel

Free estimate with a free 3D design of your new shower

On a full shower or bathroom remodel signed by December 31, 2026. One discount per project.

Claim my holiday offer

Shower remodeling in Las Vegas

Our Completed Shower Projects

Real GI Construction showers across the Las Vegas valley. Tap one to see the whole project.

Explore All Bathroom Projects

Built to last

Waterproofed before any tile goes on

Licensed plumbers set the new valve and drain, and we test for leaks before anything is closed up. A concrete shower floor sloped to the drain dries 24 to 48 hours. Then a waterproof membrane covers the walls and the floor, gets a flood test, and dries another 24 to 48 hours.

That is why a new shower takes about one week, sometimes a week and a half. A tiled shower promised in two to four days has no time for these drying steps.

A large GI walk-in shower behind frameless glass: white wave-textured tile, two rain heads, two hand showers and a tiled bench at each end

Your options

Niches, benches and frameless glass

Large marble-look porcelain tiled to the ceiling is what we install most. A niche and a tiled bench come free with every shower; many clients add a second niche, or one long niche across the back wall.

A tiled bench in the corner or across the full width, a rain head plus a hand shower on a slide bar, and frameless glass: a sliding door, a hinged door with a fixed panel, or one fixed panel. For grab bars we put wood blocking inside the wall before the tile goes on.

A white subway-tile shower with a tiled bench, a mosaic floor, a grab bar and a mosaic niche, behind frameless glass
Layout drawingPlan view of the L-shaped double vanity, toilet under the window, full-width tiled shower (after)Vanity 75″Vanity 51″ToiletTiled shower withbench6′3″ × 2′10″6′3″11′4″6′3″ × 11′4″ · 71 sq ft
Realistic 3D designA realistic 3D design of a real GI shower remodel, 6 ft 3 in x 11 ft 4 in: a full-width tiled shower with a bench, tan brick-look tile, a white hexagon floor and a gold sliding glass door; the toilet on the far wall under the window; an L-shaped green vanity with two sinks and gold mirrors
Example: the layout drawing and the realistic 3D design of a real GI shower remodel (6 ft 3 in x 11 ft 4 in): the 3 x 3 ft corner stall came out and a full-width tiled shower with a bench went in. See the finished bathroom. Yours is drawn from your own room.

Free with every estimate

Free 3D design of your new shower

At your free estimate we take photos and measurements of your bathroom and talk through what you want: the shower size, the glass, the tile, the niche.

Then we draw the layout and send you a realistic 3D design of your new shower with your estimate, like a photo of the finished room, so you see it before we build it. Change anything you like before you decide.

Get my free 3D design

How it works

Four easy steps to your free estimate

  1. Fill out the short formLeave your name, number and address. It takes a minute. Or call (702) 508-1188.
  2. We meet at your homeWe come to you and put your free estimate together with you, right there in your bathroom.
  3. You get it by e-mailYour free estimate, a 3D design of your new shower and copies of our license and insurance.
  4. You decideTell us what you’d like to change, or that you’re ready to start. We take it from there.

Free estimate

Like what you see?
Let’s plan yours.

Video review: a client in his new blue marble shower, three bathrooms in one house1:06The people really care. They care about their work, they care about how it’s left.
  • ★ 5.0 · 144 Google reviews
  • Free 3D design
  • 22 client video reviews
  • NV license #0081239

Seniors and military: $1,000 off a full shower or bathroom remodel, all year. One discount per project: you get the larger one.

Rather talk? (702) 508-1188

Free estimate at your home

Send this and we call you to set a time.

How can we reach you?(Required)
Where is the home?(Required)
What would you like done?(Required)

Prefer to talk? Call (702) 508-1188

★ 5.0 · 144 Google reviews · NV license #0081239

Our clients, on camera

22 video reviews from our clients

  • Video review: Wayne and Darlene's master bathroom1:21They told us it'd be about three weeks to do the job … and it took all of three weeks.

    Wayne and Darlene · master bathroom

  • Video review: a rebuilt walk-in shower2:01Don't try to go a cheaper way out, because then you'll end up paying money and then paying more money.

    Walk-in shower, rebuilt after another contractor

  • Video review: Britney's bathroom0:47It's just super straightforward and low stress.

    Britney · bathroom remodel

  • Video review: three bathrooms in one house1:06The people really care. They care about their work, they care about how it's left.

    Three bathrooms in one house

  • Video review: a custom shower0:57They really listened to what we wanted in our space.

    Custom shower

  • Video review: a client in his new bathroom0:30They were very attentive to detail, as you can see from the bathroom.

    Bathroom remodel

  • Video review: a renovated bathroom0:15GI Construction did a fabulous job of renovating my bathroom.

    Bathroom remodel

  • Video review: a client in his finished bathroom0:29Everything came out as expected, if not better.

    Bathroom remodel

  • Video review: a client in her new bathroom0:42I've already told my friends that I really like this company.

    Bathroom remodel

  • Video review: a client on the timing, the price and the work0:18Great timing, great price and great construction progress.

    Bathroom remodel

  • Video review: a couple in their bathroom0:46They cleaned up after themselves and took care of our house while they were doing it.

    Bathroom remodel

  • Video review: a client on a crew that started the day it said and kept everything clean0:26He started the day he was going to start … they kept everything clean.

    Bathroom remodel

  • Video review: a client in her home0:52Everything was communicated about what was going to happen ahead of time, so I knew what to expect.

    GI client

  • Video review: a client who could not have done the job any better0:35I don't think I could have done it any better myself.

    GI client

  • Video review: two clients0:22They do what they say they want to do, and that's kind of the most important thing.

    GI clients

  • Video review: a client on an amazing experience with GI Construction0:21My experience with GI Construction was top and bottom amazing.

    GI client

  • Video review: a client on a respectful crew that cleaned up after itself0:19Everybody was respectful … they cleaned up after themselves.

    GI client

  • Video review: a client on a job that went well from beginning to end0:37From the beginning to the end, actually, everything has been fantastic.

    GI client

  • Video review: a client on a crew that was always on time0:16They were always here on time … I would highly recommend.

    GI client

  • Video review: a client in his kitchen0:24We picked GI because we know they are consistent, they're reliable.

    GI client

  • Video review: a first-time home buyer0:54They knew where to go buy materials, how to work the insurance companies.

    First-time home buyer

  • Video review: a couple who hired GI twice0:48This is our second project with Isaac … we're pleased with both of them.

    Two projects with GI

Peace of mind

Licensed, insured and bonded

  • Licensed general contractorNevada B-2 Residential and Small Commercial, license #0081239.
  • Workers’ compensationIf someone gets hurt working on your job, it’s covered.
  • $1M / $2M liability$1 million per claim, $2 million per year, to protect your home and property.
  • BondedA $30,000 contractor’s license bond.
  • 1-year warrantyIn writing, on our work.

Every client gets copies of our license and insurance. See our license on the Nevada State Contractors Board →

Where we work

Shower remodeling across the Las Vegas valley

Every pin is a bathroom we’ve finished, shown near the home, never on it. Tap one to see the project.

  • Las Vegas
  • Henderson
  • Summerlin
  • North Las Vegas
  • Boulder City
  • Spring Valley
  • Enterprise
  • Anthem
  • Southern Highlands
  • Centennial Hills
  • Lake Las Vegas
  • Inspirada

Questions

Shower remodel questions we hear most

How much does a shower remodel cost in Las Vegas?

It depends on the size of the shower, the glass and extras such as a second niche or a second shower head. Your exact price comes at the free estimate, after we see the room.

How long does a shower remodel take?

About one week, sometimes up to a week and a half. Most of that time goes into the concrete shower floor and the waterproofing drying before the tile goes on.

What size is a standard shower?

The shower space we rebuild most is the size of a standard tub: about 5 feet wide and 2½ to 3 feet deep. The square corner showers we build are about 4 by 4 feet. We measure your room at the estimate.

How do you build the shower floor (the shower pan)?

For a tiled shower we shape a concrete floor that slopes to the drain and let it dry. Then a waterproof membrane goes over the floor and the walls, and gets a flood test, before any tile goes on. Acrylic panel showers sit on a premade base instead.

Can you fix a leaking shower?

We don't do leak-only repairs; those need a plumbing contractor. If you want the shower rebuilt, a remodel replaces the valve, the drain, the floor and the waterproofing.

Can I keep my tub and redo the shower above it?

Yes. We set a new tub and tile the walls above it to the ceiling, with a niche. If you want the tub gone, see tub to shower conversion.

Do you install acrylic panel showers?

Yes, when a client wants a shower without grout lines: acrylic wall panels on a premade base. Almost every shower we build is tiled.

Can you add a shower bench or grab bars?

Yes. A tiled bench comes free with every shower: it is framed, waterproofed and tiled together with the shower. For grab bars we put blocking in the wall before the tile goes on.

Is a shower remodel the same as a shower replacement?

For us, yes. Remodel, replace and rebuild all mean one job. The old shower comes out down to the studs, and a new one is built in the same spot: a new valve and drain, a waterproofed floor and walls, and tile to the ceiling. It makes no difference whether the old one was a stall or a tub and shower combo. For our crew that is the same work. We also set acrylic panel showers on a premade base when a client wants no grout lines, but almost every shower we build is tiled. A replacement with us is a full rebuild, not a patch.

What is a shower pan, and can you replace just the pan?

The shower pan is the floor of the shower. It catches the water and carries it to the drain. In a tiled shower it is a concrete floor, shaped to slope to the drain, with the waterproofing over it and the tile on top. We build that floor, the walls, the curb and the niche as one waterproofed shower, so we rebuild them together instead of swapping the pan alone. We do not do leak-only repairs. If your pan is cracked or leaking, a shower remodel replaces the valve, the drain, the floor and the waterproofing in one job. In a panel shower, the pan is a premade base.

Should shower walls be waterproofed?

Yes, and ours are. The walls are cement board with a waterproofing membrane over it. The floor, the niche and the curb get the same membrane. It gets a flood test and then dries 24 to 48 hours before any tile goes on. Our price list names three systems for this job: Kerdi, RedGard and Hydro Ban. The membrane goes on before the tile, so waterproofing an old shower means taking it down and rebuilding it. That is why a shower remodel, not a coating over old tile, is how we answer a shower that leaks.

Can I remodel just the shower and leave the rest of the bathroom alone?

Yes. Since November 2023 our clients have signed 33 bathrooms that were a tiled shower and nothing else: no new vanity and no new floor. Another 36 were a shower or tub plus a new vanity, without new floor tile. And 60 were full bathrooms with a new walk-in shower. So the shower on its own is a normal job for us. It takes about one week, most of it for the layers that must dry. Your estimate lists exactly what is included.

What makes one shower remodel cost more than another?

Glass is the clearest step. Among the tiled walk-in showers our clients signed since November 2023, the ones with frameless glass in the price sit clearly above the ones without. The usual smallest job we do is a plain tiled shower in a standard tub-sized space, with a niche and a tiled bench, both free. After that, extras add to the estimate: a second niche, a second shower head, grab bars, a tiled half wall, a curbless floor, a window wrapped in tile, or slab walls instead of tile. Your exact price comes at the free estimate.

What kind of glass can a remodeled shower have, and when is it measured?

Our finished showers use frameless glass. You can choose a sliding door on a roller bar in chrome, black or gold, a hinged door with a fixed panel, or one fixed panel with an open entry. Of our signed bathroom proposals since November 2023, 73 had a sliding glass door and 37 had one fixed panel. The glass is made to fit the finished shower, so it is measured after the tile is done. That is why it is the last thing to go in.

Can you make my shower bigger when you rebuild it?

Yes, if there is space to take. In many master baths a tub and a small stall sit side by side. We take both out and build one big walk-in across the end, about 8 feet by 42 inches, often with a bench under the window. It is the master bathroom job we do most, about 20 rooms in our photo records. The other way is to move a wall: 20 of our 179 signed bathroom proposals since November 2023 had a wall framed or removed, for one reason or another. Ten homeowners wrote "bigger shower" in their request, and all four who reached a proposal ended with a shower-only room. We measure your room at the free estimate.

Who does the plumbing?

Licensed plumbing contractors do the plumbing inside our remodels. We do not take plumbing-only jobs.

Is GI Construction licensed?

Yes. GI Construction LLC is a Nevada licensed B-2 Residential and Small Commercial contractor, license #0081239.

What is the new trend in showers?

We can only speak for our own jobs in Las Vegas, not for the whole country. The shower we finish most often is tiled to the ceiling, usually in large marble-look porcelain, sometimes wood-look tile or two-tone walls. It has a rain head plus a hand shower on a slide bar, a niche with a pebble or mosaic back, a pebble or hexagon floor, a low curb and frameless glass. What we tear out tells the rest: framed glass doors, old stalls with a framed opening and, in older master baths, round glass-block showers. None of our finished showers has framed glass.

What is the least expensive way to replace a shower?

Of the showers we build, the premade ones cost the least on our price list: a premade pan with three acrylic wall panels, or a one-piece stall where the opening fits it. There is no tile to set, so there is less work. Few of our clients pick one; almost every shower we build is tiled. For a tiled shower, the plainest is a standard tub-sized space with one niche, the valve and drain staying where they are, and no extras. Moving the valve to another wall means new water lines inside the wall, and frameless glass is the clearest step up in price.

What should you not do when redoing a shower?

Do not leave the choices that live inside the wall for later. Grab bars need wood blocking in the wall, so decide on them before the tile goes on. A second shower head or a hand shower needs its own pipe and outlet, set with the rough plumbing before the wall is closed. Niches and a bench are framed and waterproofed with the shower, so place them early too. Do not order the glass first: it is measured after the tile is done, so it fits the finished shower. And with an open entry, keep the shower head on the far end, away from the opening.

Is the estimate free?

Yes. We come to your home, look at the bathroom and give you a price, with a free 3D design of your new shower. You decide after that.

What areas do you serve?

Las Vegas and the whole valley: Henderson, Summerlin, North Las Vegas, Boulder City, Spring Valley, Enterprise, Anthem, Southern Highlands, Centennial Hills and nearby areas.

Ready for a new bathroom?

Send the short form and we call you to book your free estimate. We come to your home, look at the room and give you a price.

GI Construction LLC · Nevada licensed B-2 Residential and Small Commercial contractor, license #0081239 · 410 S Rampart Blvd, Suite 390, Las Vegas, NV 89145