Ready to Transform Your Home?
Your dream space is just a call away. Let’s bring your vision to life with expert craftsmanship, unmatched dedication, and a commitment to quality that lasts.

Bathroom project · Las Vegas
An old drop-in tub and a framed shower stall became one open wet room: a freestanding tub on a tiled platform beside an open shower with a pebble floor.
Get a free estimate 5.0 from 144 Google reviews
Licensed Nevada contractor · B-2, license #0081239
Holiday offer: $1,350 off your bathroom remodel See the offer
The project
Cat found GI Construction on Google. She wanted to update the bathrooms, replace the kitchen’s tile counters and sink, and refresh the fireplace, and in one job we did all of it, with new flooring through the house. This page is the master bathroom, which we turned into a wet room: the freestanding tub and the open shower now share one raised, waterproofed tile floor.
Before, a drop-in tub sat in a tiled deck under the arched window, with a gold-framed glass shower stall beside it. Across the room was a long tile-top vanity with two sinks, and most of the floor was black carpet.
We took all of it out and framed one raised platform from the shower all the way to the left wall. The whole platform and the shower walls were waterproofed, and the platform is tiled in white hexagon mosaic, with a matte black metal edge where it meets the new floor.
The new freestanding tub is a white rectangular acrylic tub, 59 inches long, set on the platform under the window, with a floor-mounted filler and hand shower in brushed nickel beside it.
The shower is the open end of the same platform: marble-look tile on the walls, a floor of blue and beige pebble tile, a niche lined with the same pebbles and edged in matte black, a square rain shower head and a hand shower. One frameless glass panel stands at its front; the side toward the tub stays open.
Across the room, a new double vanity in a dark truffle finish runs along the wall: a sink cabinet at each end, drawers in the middle, a white quartz top with gray veining, two undermount sinks and two faucets. Two framed mirrors and two medicine cabinets went up above it, a new toilet went in, and vinyl plank replaced the carpet.
Cat chose the materials at a showroom and sent Isaac her list to check the quantities. In her review she wrote that Isaac and his team gave “good insight and suggestions” when she wasn’t sure about a couple of ideas.
On photo day, March 5, 2025, Isaac Reuven, GI Construction’s president, introduced the project at the fireplace and then showed the finished master bathroom, which he called his favorite part of the project.
“Hey everyone, Isaac with GI Construction here, and welcome to another project. In this project, we gave a face lift to the fireplace. We did the flooring throughout the whole house. We did the guest bathroom and the master bathroom. Let me show you around.
So this is my most favorite part of this project, this beautiful master bathroom. We ripped out everything was here, came out into this wonderful shower. It’s actually one of my favorite showers, from the bluish pebbles on the floor throughout everything you see around, and this beautiful freestanding bathtub. So we did the vanities as well, the flooring, the bathtub, the shower, and here it is.”
Before and after
The layout
The drawings show where everything is, from the photos of this bathroom and the homeowners’ material list; they are for reference and show no sizes.
How it came together
Demolition. The old tub, its tile deck and the shower stall taken out, down to the framing and the concrete floor. January 30, 2025.
Waterproofing. The new platform framed from the shower to the left wall, and the platform and shower walls coated red with waterproofing. February 7, 2025.
Tile. Marble-look tile on the walls, white hexagon mosaic on the platform and the pebble floor in the shower, the tub’s water lines waiting in the floor. February 13, 2025.
Tub in. The freestanding tub set on the platform, with the rain head and hand shower in; the glass panel went in after. February 18, 2025.
The finished room
All from Cat’s master bathroom, photographed on March 5, 2025 (the whole-room view on February 25, 2025). Tap a photo to see it big.
The review
“I’m glad I found GI Construction to help renovate my house with new kitchen counters, new flooring, and updating the fire place and both bathrooms. Isaac and his team were great from start to finish, giving good insight and suggestions when I wasn’t quite sure on a couple of ideas. Valentine (PM, I think) was great to work with and all the employees were very professional. They worked quickly and addressed any concerns/questions I had. The price was fair and I’d definitely recommend them to anyone looking for a contractor.”
Cat, 5 stars on Google, March 5, 2025, the day we photographed her finished home. · GI Construction: 5.0 from 144 Google reviews
Watch: Cat in her new master bathroom (41 s). “On a scale from 1 to 10, how would you rate your experience?” “A 10.”
Where it is
This master bath wet room, with its freestanding tub, is in a home in the City of Las Vegas, in ZIP code 89108. To keep the family’s address private, the pin marks the area, not the house.
Free with every estimate
Isaac plans the room with you, then we send you a 3D design of your new bathroom with your estimate, so you see it before we build it.
One discount per project.
Ready to remodel your master bathroom?
We come to your home, measure the room and send you a written estimate. Free. When your job needs one, we handle the whole permit for you.
5.0 from 144 Google reviews
Licensed Nevada contractor: B-2, license #0081239
Send this and we call you to set a time.
Prefer to talk? Call (702) 508-1188
★ 5.0 · 144 Google reviews · NV license #0081239
Questions
A bathroom, or part of one, where the shower is open and the floor around it is waterproofed as one. In this wet room the freestanding tub and the open shower stand on one raised tile platform, waterproofed from wall to wall, and a single glass panel stands at the shower’s front.
Yes, this one does. The freestanding tub sits on the same tiled platform as the shower, under the arched window, and the side of the shower toward the tub is open.
Yes. Here we took out the drop-in tub, its tile deck and the shower stall beside it, framed a new platform in their place and set a white freestanding tub on it, connected to the existing drain.
A raised floor we framed from the shower all the way to the left wall. It was waterproofed with the shower, tiled in white hexagon mosaic, and finished with a matte black metal edge where it meets the vinyl plank floor.
Not always. This shower has no door: one frameless 3/8 inch tempered glass panel stands at its front, and the side toward the tub stays open.
A shower floor laid with small rounded pebble tiles that come joined on sheets. This one is blue and beige, and the same pebbles line the shower niche.
It is a white acrylic freestanding tub, 59 inches long, with a floor-mounted filler and hand shower beside it.
It depends on the work, and we tell you at the free estimate. When your job needs one, we handle the whole permit for you.
In the same job we remodeled the guest bathroom with a new tub, wall tile, a niche and a new vanity with a quartz top; put quartz counters, a new sink and faucet in the kitchen; gave the fireplace a face-lift with stone and a mantel; and laid vinyl plank flooring through the house.
More: Bathroom remodeling in Las Vegas · Master bathroom remodel · Walk-in showers · All our projects
GI Construction is a licensed Nevada contractor: B-2 Residential and Small Commercial, license #0081239. Look it up with the Nevada State Contractors Board.
Your dream space is just a call away. Let’s bring your vision to life with expert craftsmanship, unmatched dedication, and a commitment to quality that lasts.