Ready to Transform Your Home?
Your dream space is just a call away. Let’s bring your vision to life with expert craftsmanship, unmatched dedication, and a commitment to quality that lasts.

Bathroom project · Northwest Las Vegas
A new drop-in tub in a marble-look tile deck, a closed shower stall opened into a walk-in shower, and two new vanities, hers and his.
Get a free estimate 5.0 from 144 Google reviews
Licensed Nevada contractor · B-2, license #0081239
Holiday offer: $1,350 off your bathroom remodel See the offer
The project
Kris found GI Construction on Google, and in the same job we remodeled four bathrooms in her home: three with new showers, and a downstairs bathroom with a new vanity. This page is the master bathroom, a room with both a drop-in tub and a walk-in shower: we put in a new tub, opened up the shower, and replaced both vanities.
Before, an oval drop-in tub sat in a dark tile deck in the window bay, between two dark wood vanities with white tops. Across the room, the shower was a closed stall behind a front wall, with only a narrow framed glass door in a tall tiled opening.
The new drop-in tub is a white rectangular tub in a newly framed deck, set in the same bay. The deck and its front are faced with marble-look tile, with the filler mounted on the deck.
We reframed the shower to take its front wall out, and it is now a walk-in shower behind frameless glass, a fixed panel and a door. It has marble-look tile on the walls, a pebble shower floor, a niche lined with the same pebbles, a rain shower head and a hand shower.
Two new cream raised-panel vanities with marble-look quartz tops took the place of the dark wood ones, one on each side of the tub, each with one sink, an LED mirror and a new light above it.
The windows and the rust-brown floor tile stayed. Kris bought the materials, and she and Isaac chose the colors together.
One thing Kris had lived with: a cabinet door in the old vanity that would not open properly and kept hitting the section next to it. The new cabinets were laid out so every door opens without touching.
On photo day, October 24, 2024, Isaac Reuven, GI Construction’s president, walked through the finished master bathroom: the closed shower opened up, the two vanities that mirror each other, and why the cabinet layout matters.
“In this project, we did three bathrooms. This is the master bathroom. In this section, we took a small shower, it was completely enclosed, that made the whole thing look like a cave, opened up the walls, turned it into a big, beautiful shower with bright colors, earthy flooring and shampoo niche colors that make it feel like a spa, and it flipped the whole thing to this beautiful, beautiful shower.
In this section, we did the vanities. It was older vanities, brownish colored, everything was really dark in this bathroom, and kind of wanted to brighten it up to make it feel a lot more open, more spa-like, if you would say.
So we turned it into these beautiful vanities. I think it has a hint of Mediterranean to it. This countertop, which is one of my favorite countertops, I have it installed in my home as well, because it’s a very flowy touch of, you know, grayish to it. The sink, the faucet, and the LED mirror.
Same thing on the other side, it’s just a lot bigger. So the sinks mirror each other, but these vanities go a little longer than the other side. So this bathroom has a his and hers, or actually hers and his, but they are the same vanities, countertop, sink, faucet, everything.
This is a problem that an inexperienced contractor or a vendor can mess up every time. When it comes to cabinetry, whoever does the layout of the cabinetry is very important. Often, unfortunately, people let people that are not experienced, salespeople or something like that, do the layout.
If they do the layout and they don’t have enough experience, even the littlest detail that they mess up, like for example putting enough buffer, can create large issues. In this project it’s not as big, it’s a bathroom, not a kitchen; in a kitchen there can be a lot more problems.
But even here, one of the biggest issues that the clients had in this section is that the door that they had here with the cabinet would not open properly, and would hit this section all the time. So when we redid the project, we made sure that everything was aligned properly, and everything, to the millimeter, would open up without grinding, without touching, and without messing up, and creating nicks and damaging the bathroom.”
Before and after
The layout
The drawings show where everything is, from the photos of this bathroom and the vanity measurements on the proposal; they are for reference and show no sizes.
How it came together
Shower tile. Marble-look tile going up on the shower walls, with the niche framed in. Photographed August 29, 2024.
The tub. The new drop-in tub set in its framed deck, the marble-look tile going on, the windows covered for the work. September 6, 2024.
Vanities. Vanity work under way: one vanity in place with its top, LED mirror and light, the next cabinet boxes in the room. September 12, 2024.
Glass. The frameless glass going in at the shower, the pebble floor and niche finished. September 12, 2024.
The finished room
All from Kris’s master bathroom, photographed on October 24, 2024 (the niche close-up on September 12, 2024). Tap a photo to see it big.
The review
“I had an excellent experience with GI Construction from really start to finish on the remodeling of 4 bathrooms… The construction team led by Valentin were all fabulous - they were polite, clean and respectful of our home. They asked detailed questions on things like tile size/placement, door handle location, etc. that I wouldn’t have thought they would even ask my opinion to ensure they were meeting expectations… The work quality was excellent.”
Kris, 5 stars on Google, November 20, 2024, after her four bathrooms. · GI Construction: 5.0 from 144 Google reviews
Watch: Kris in her new master bathroom (51 s). “Everything was communicated about what was going to happen ahead of time, so I knew what to expect along the way, and it really happened like they said it would.”
Where it is
This master bathroom, with its drop-in tub and walk-in shower, is in a home in the northwest of the Las Vegas Valley, in ZIP code 89149. To keep the family’s address private, the pin marks the area, not the house.
Free with every estimate
Isaac plans the room with you, then we send you a 3D design of your new bathroom with your estimate, so you see it before we build it.
One discount per project.
Ready to remodel your master bathroom?
We come to your home, measure the room and send you a written estimate. Free. When your job needs one, we handle the whole permit for you.
5.0 from 144 Google reviews
Licensed Nevada contractor: B-2, license #0081239
Send this and we call you to set a time.
Prefer to talk? Call (702) 508-1188
★ 5.0 · 144 Google reviews · NV license #0081239
Questions
Yes, and this one does. The drop-in tub sits in the window bay between the two vanities, and the walk-in shower is at the other end of the room, where the closed stall used to be.
A tub with a rim that rests on a framed deck around it, so only the deck and its front show. Here the new tub is a white rectangular drop-in tub, and the deck and its front are faced with marble-look tile.
Yes. Here we took out the old oval tub and its dark tile deck, framed a new deck in the same bay for a rectangular tub, and tiled the deck and its front. Under the tile, the tub surround got cement board and a waterproof membrane.
Yes. This shower was a closed stall behind a front wall, with only a narrow framed door in a tall tiled opening. We reframed it to take the front wall out, and the shower now opens behind frameless glass: a fixed panel and a door.
A shower floor laid with small rounded pebble tiles that come joined on sheets. Here the pebble shower floor is in earthy tones, and the same pebbles line the shower niche.
This shower has frameless 3/8 inch tempered glass. Frameless glass has no metal frame around the panels, only small clamps and hinges, so the tile shows through.
Yes. The rust-brown floor tile in this bathroom was not part of the job and stayed. The new tub deck, the shower and the vanities were built to meet it.
It depends on the work, and we tell you at the free estimate. When your job needs one, we handle the whole permit for you.
Yes. In the same job we remodeled three more bathrooms in Kris’s home: two with new walk-in showers and vanities, and a downstairs bathroom with a new vanity, top, mirror and light. In the video Isaac counts the three bathrooms with new showers.
More: Bathroom remodeling in Las Vegas · Master bathroom remodel · Walk-in showers · All our projects
GI Construction is a licensed Nevada contractor: B-2 Residential and Small Commercial, license #0081239. Look it up with the Nevada State Contractors Board.
Your dream space is just a call away. Let’s bring your vision to life with expert craftsmanship, unmatched dedication, and a commitment to quality that lasts.